Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13635960
| No.13635960
- Product Categories
- Friendly Links
| Information Name: | Knowledge of the distribution operation cabinet |
| Published: | 2015-01-07 |
| Validity: | 365 |
| Specifications: | Knowledge of the distribution operation cabinet |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Switch SYN2015.01 distribution cabinet power distribution hub for the normal operation of the ship and eight production facilities, and any unrelated persons not flip board. After the generator starts up speed switch power screen manual should use slow acceleration, until the generator into the normal working state, the voltage and frequency reaches a predetermined value, before closing transmission. After the distribution cabinet power distribution board into the distribution state, not free Stubbs dynamic screen increases the speed switch, air circuit breaker lockout switch may not be used for non-emergency situations. Generator running in parallel and in strict accordance with the provisions of vehicle operating conditions require, we should pay attention to when reverse power (countercurrent) and vehicle failures and so on. Stop when the first cut off the generator load, then load the parking, not directly with a load shutdown. Interleaved when shore power, shore power should be cut off the power switch each screen, and then check the wiring and phase sequence of correctness, confirm correct before the implementation of the ship shore power conversion, with the charge of the operation is prohibited. Distribution cabinet should be regularly cleaned and maintenance work, so the device is always in good working condition. A generator, turbine When switchboard operations staff should focus thinking, exercise caution to prevent accidents, or they will be held personally responsible for the accident. Discharge board for the ship's emergency switchboard, duty engineer should always check the status of their work any time to ensure adequate low-voltage power, instrumentation and control by the board of magnetic saturation regulator working conditions. When the normal navigation, power distribution switch should be in the on-board and the brightest to ensure that the generator can be activated at any time and should be supervised at all times be able to put to use. I hope the above points round members of the Department strictly adhered to. Source: http: //www.jldydq.cn/ |
Admin>>>
You are the 7263 visitor
Copyright © GuangDong ICP No. 10089450, Ocean Electrical Technology Co., Ltd., Jilin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7263 visitor
Copyright © GuangDong ICP No. 10089450, Ocean Electrical Technology Co., Ltd., Jilin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

